In all construction zones, motorists are asked to reduce speed, obey posted signs, and use extreme caution, as well as continue to be cautious of heavy equipment and construction personnel in the area. 

White Sands Missile Range Notification

For information regarding closures you may call WSMR at 678-1178 or 678-2222 for updates.  

Traffic updates are posted on the NMDOT traffic advisory web-site here and can be retrieved through our automated system at 511 in New Mexico or 1-800-432-4269 from any line.

Interstates:

I-25, Mile Marker 154 to 157.839, Lemitar 

Mountain States Constructors, Inc. (Contractor) is continuing with bridge replacement and roadway reconstruction on Interstate 25 in Socorro Co. Traffic will be rerouted onto both northbound and southbound lanes for the finalization of this project. A 12’ width restriction will be in effect throughout the project. Construction will be Monday through Friday from 6:30 a.m. to 6:00 p.m. Construction is expected to be completed by winter 2018. 

I-10, Mile Marker 133 to 164, Las Cruces to Texas State Line

Valley Fence (Contractor) will be performing guardrail replacement along Interstate 10 in Dona Ana Co. starting at milepost 133 headed east to Texas State line. Traffic will encounter lane closures including overnight closures intermittently with eastbound and westbound exits closed off to all traffic as needed as well as reduced interstate speeds limits.

I-10 eastbound right lanes will be closed from MP 140.6 to MP 144.6 starting Monday (11/18/18) from 6:30 a.m. to 5:30 p.m., Sunday through Wednesday. The on and off ramps within this work zone will remain open. I-10 Westbound Right Lane will be closed from MP 144.6 to MP 140.6 starting on 11/20/18 to 11/21/18. Guardrail Installation will resume on 11/26/18 after the Thanksgiving weekend.  

I-10, Mile Marker 2.5 to 22, Lordsburg

MWI, Inc. (Contractor) Construction is currently suspended for the  Intelligent Transportation System (ITS).

I-10, Mile Marker 85.5, Deming

The New Mexico Department of Transportation will have intermittent personnel and equipment on the roadway for bridge deck repairs. Traffic will encounter lane closures on both eastbound and westbound lanes. Speed limits will be reduced to 55 mph, closures and traffic control shall remain in place 24 hours a day 7 days a week. Construction hours will be Monday through Thursday from 7:00 a.m. to 5:30 p.m. and is expected to be completed by November 2018.

US Roadways:

US 380, Mile Marker 0 to 40, San Antonio

Highway Supply (Contractor) will continue with replacement of small signage along US 380 in Socorro County. Traffic will encounter intermittent lane drops for shoulder work. Construction will begin at mile marker 40 working west towards San Antonio. Hours of operation will be Monday through Friday from 7:00 a.m. to 5:00 p.m.

US 60, Mile Marker 103 to 117, Magdalena

Cutler Repaving (Contractor) has completed roadwork for the winter months. Completion will begin next spring.

State Roadways:

NM 192 mile post 2.1, Mesquite NM

The New Mexico Department of Transportation will have intermittent personnel and equipment on the roadway for cattle guard removal starting Wednesday November 14th. Traffic will encounter lane closures with a flagging operation. Construction hours will be Wednesday through Friday from 8:00 a.m. to 3:00 p.m. and is expected to be completed by November 2018.

NM 404 “E OHara Rd”, Mile Marker 0 to 1, Anthony

FNF Construction, INC. (Contractor) has begun the installation of a shared use path and lighting along NM 404 "E OHara Rd" in Anthony, New Mexico. Traffic may encounter lane drops and flagging operations. Speed limits will be reduced at times. Contractor’s hours of operation will be from 7:00 a.m. to 5:00 p.m. Monday to Friday.

NM 90, Mile Marker 0 to 22.6, Lordsburg to Silver City

Brasier Asphalt (Contractor) has completed roadwork, striping to take place in the next few weeks.

NM 188 Valley Drive/ NM 28 Avenida de Mesilla, Las Cruces

AUI, Inc. (Contractor) is currently performing roadway reconstruction, utility replacements and lighting/signalization improvements on Valley Drive. Currently the active zone of construction is on Valley Drive from Picacho to Amador. Traffic is pushed into the northbound lanes as the southbound lanes are closed for construction. Traffic is no longer be able to cross Valley drive using Hadley. Hadley must be closed to allow the installation of underground utilities. Amador is reduced to one lane in each direction and all traffic has been pushed to the Southside of the roadway. Starting 11/19/18 all traffic will be placed on the Westbound lanes on Avenida de Mesilla to allow complete reconstruction on eastbound lanes. Construction will be from 7:00 a.m. to 5:00 p.m., 5 days a week.

NM 15 “Pinos Altos”, Mile Marker 0 to 1.21, Silver City

TLC Construction (Contractor) will be reconstructing the roadway, installing curb and gutter, sidewalk and bike lanes. NM 15 from HWY 180 to the 32nd street interchange will have one-way traffic only. Pine Street and Bosworth will be closed to through traffic at Pine/PA Road intersection while the contractor is reconstructing the roadway. Detours will be in place and traffic is asked to reduce speed and use caution and seek an alternate route if possible. Contractor's hours of operation will be from 7:00 a.m. to 5:00 p.m. Monday through Friday; closures and traffic control shall remain in place 24 hours a day 7 days a week. Construction is scheduled to be completed by spring of 2019.

NM 136 “Pete V Domenici Hwy”, Mile Marker 0.448 to 9.168, Santa Teresa

FNF Construction, INC. (Contractor) continues with roadway reconstruction, roadway rehabilitation, bridge rehabilitation, signalization & lighting along NM 136, Pete V Domenici Intl. Hwy. Traffic will encounter lane closures as well as detours with an 11’ width restriction in effect throughout the project, traffic will be moved to the northbound lanes in areas. Outside of the work zone, traffic will still have double lanes in both directions with occasional lane closures for shoulder work. In addition, we will only have 4’ outside shoulder and 2’ shoulder in the barrier wall locations both directions. Contractor’s hours of operation will be from 7:00 a.m. to 5:00 p.m. Monday to Friday; lane closures and traffic control shall remain in place 24 hours a day 7 days a week.

NM 498 “Racetrack Drive” Mile Marker 0.600 to 0.900, Sunland Park 

Hasse Contracting Co., Inc. (Contractor) construction is currently on suspension. NM 498 is closed from Doniphan Drive to Futurity Drive; detour is in place on Sunland Park Drive.

NM 273 “McNutt Road” Mile Marker 0 - 3, Sunland Park

Constructors, Inc. (Contractor) continues with roadway reconstruction, rehabilitation, signalization & lighting along NM 273 “McNutt Rd”. Traffic is being diverted from southbound driving lanes to northbound driving lanes with a single lane of travel in each direction.  Motorists are asked to reduce speed and follow all temporary construction signing.  The contractor’s hours of operation will be from 6:30 a.m. to 5:30 p.m., Monday through Friday. Construction is expected to be completed by fall 2019.

Chip Sealing Operations:

The New Mexico Department of Transportation (NMDOT) will be performing “Chip Sealing” with Brooming and Fog Sealing operations in Sierra Co.  Speed limit will be reduced, traffic will encounter no center stripe and there will be loose gravel on roadway. Traffic will encounter lane drops with pilot car and flagging operations.   

Roadways affected will be:

NM 181 from mile post 0 to 8.9, T or C to Red Rock

NM 195 “Lakeshore Rd” from milepost 0 to 2 and milepost 3 to 4, Elephant Butte

NM 52, NM 142, NM 179, NM 51 (3rd Street), NM 177: complete and waiting for striping

Las Cruces Projects – City of Las Cruces:

Arroyo Road

From Red Hawk Golf Road to Sonoma Ranch Blvd will be closed to through traffic. Motorists will be asked to decrease speed and follow detours around the construction zone.

Brownlee Avenue

From Second Street to Third Street will be closured to through traffic. Access to residents will be maintained at all times. Motorists will be asked to decrease speed, follow the posted detour routes around the construction zone, and should proceed with caution.

Church Street

From Bowman Avenue to Griggs Street will have one lane closured to traffic. Access to businesses will be maintained at all times. Motorists will be asked to decrease speed, follow the posted detour routes around the construction zone, and should proceed with caution.

Fourth Street and Harrelson Street

Open to through traffic.

Las Cruces Avenue

From Church Street to Campo Street and Main Street to Water Street will be closed to through traffic. Access to businesses will be maintained at all times. Motorists will be asked to decrease speed, follow the posted detour routes around the construction zone, and should proceed with caution.

Miranda Street

From Parker Avenue to Palmer Avenue will be closured to through traffic. Access to businesses and residents will be maintained at all times. Motorists will be asked to decrease speed, follow the posted detour routes around the construction zone, and should proceed with caution.

Roadrunner Parkway

From Bataan Memorial West to Sunridge Drive will be closured to through traffic. Access to residents will be maintained at all times. Motorists will be asked to decrease speed, follow the posted detour routes around the construction zone, and should proceed with caution.

Second Street

From Picacho Avenue to W Hadley Avenue will be closured to through traffic. Access to businesses will be maintained at all times. Motorists will be asked to decrease speed, follow the posted detour routes around the construction zone, and should proceed with caution.

Water Street

From Bowman Avenue to Griggs Street will have the west lane closured to traffic. Access to businesses will be maintained at all times. Motorists will be asked to decrease speed, follow the posted detour routes around the construction zone, and should proceed with caution.

El Paso Projects – Go 10/Border West Expressway

Closures are posted on the TxDOT website here.

PLEASE NOTE: Conditions are subject to change without notice. Double fines for speeding in work zones may be in effect.

For more information log onto here or call 511.

Content on the Beat

WARNING: All articles and photos with a byline or photo credit are copyrighted to the author or photographer. You may not use any information found within the articles without asking permission AND giving attribution to the source. Photos can be requested and may incur a nominal fee for use personally or commercially.

Disclaimer: If you find errors in articles not written by the Beat team but sent to us from other content providers, please contact the writer, not the Beat. For example, obituaries are always provided by the funeral home or a family member. We can fix errors, but please give details on where the error is so we can find it. News releases from government and non-profit entities are posted generally without change, except for legal notices, which incur a small charge.

NOTE: If an article does not have a byline, it was written by someone not affiliated with the Beat and then sent to the Beat for posting.

Images: We have received complaints about large images blocking parts of other articles. If you encounter this problem, click on the title of the article you want to read and it will take you to that article's page, which shows only that article without any intruders. 

New Columnists: The Beat continues to bring you new columnists. And check out the old faithfuls who continue to provide content.

Newsletter: If you opt in to the Join GCB Three Times Weekly Updates option above this to the right, you will be subscribed to email notifications with links to recently posted articles.

Submitting to the Beat

Those new to providing news releases to the Beat are asked to please check out submission guidelines at https://www.grantcountybeat.com/about/submissions. They are for your information to make life easier on the readers, as well as for the editor.

Advertising: Don't forget to tell advertisers that you saw their ads on the Beat.

Classifieds: We have changed Classifieds to a simpler option. Check periodically to see if any new ones have popped up. Send your information to editor@grantcountybeat.com and we will post it as soon as we can. Instructions and prices are on the page.

Editor's Notes

It has come to this editor's attention that people are sending information to the Grant County Beat Facebook page. Please be aware that the editor does not regularly monitor the page. If you have items you want to send to the editor, please send them to editor@grantcountybeat.com. Thanks!

Here for YOU: Consider the Beat your DAILY newspaper for up-to-date information about Grant County. It's at your fingertips! One Click to Local News. Thanks for your support for and your readership of Grant County's online news source—www.grantcountybeat.com

Feel free to notify editor@grantcountybeat.com if you notice any technical problems on the site. Your convenience is my desire for the Beat.  The Beat totally appreciates its readers and subscribers!  

Compliance: Because you are an esteemed member of The Grant County Beat readership, be assured that we at the Beat continue to do everything we can to be in full compliance with GDPR and pertinent US law, so that the information you have chosen to give to us cannot be compromised.